Thursday, June 20, 2013
   
Text Size

Website Search

Load shedding schedules

What is Load Shedding?

When there is insufficient power station capacity to supply the demand (load) from all the customers, the electricity system could become unstable, possibly resulting in a national black-out. To avoid this, Eskom can either increase supply or reduce demand.

To increase supply, Eskom will run its power stations at maximum available capacity. In addition to the coal and nuclear plant, hydro and open cycle gas turbine stations are used at peak times when demand is high.

To reduce demand, Eskom will first call on customer contracts that allow for supply to be reduced or interrupted for specific periods and durations. If this is not enough, Eskom is forced to cut supply to all other customers. This could be done through either Scheduled or Emergency Load Shedding.

During Scheduled load shedding parts of the network are switched off according to a predetermined schedule, with the impact spread equitably over the customer base. Shedding is predictable and allows for customers to plan accordingly.

In exceptional circumstances additional Emergency load shedding could be required. Control Centres will shed load using emergency switching in order to protect the network. This will be less predictable and all customers can expect to be affected at any time.

Documents

Order by : Name | Date | Hits [ Descendent ]

Alberton Alberton

hot!
Date added: 05/29/2013
Date modified: 05/29/2013
Filesize: 80.21 kB
Downloads: 5271

Load shedding schedules for:

  • Alberton
  • Thokoza Customer Care Areas

Bedfordview Bedfordview

hot!
Date added: 05/29/2013
Date modified: 05/29/2013
Filesize: 75.77 kB
Downloads: 2178

Load shedding schedules for:

  • Edenvale
  • Bedfordview Customer Care Areas

Benoni Benoni

hot!
Date added: 05/29/2013
Date modified: 05/29/2013
Filesize: 68.69 kB
Downloads: 3905

Load shedding schedules for:

  • Benoni

Boksburg Boksburg

hot!
Date added: 05/29/2013
Date modified: 05/29/2013
Filesize: 70.16 kB
Downloads: 5859

Load shedding schedules for:

  • Boksburg
  • Vosloorus Customer Care Areas

Brakpan Brakpan

hot!
Date added: 05/29/2013
Date modified: 05/29/2013
Filesize: 65.38 kB
Downloads: 3525

Load shedding schedules for:

  • Brakpan
  • Kwa-Thema Customer Care Areas

Edenvale Edenvale

hot!
Date added: 05/29/2013
Date modified: 05/29/2013
Filesize: 75.77 kB
Downloads: 2503

Load shedding schedules for:

  • Edenvale
  • Bedfordview Customer Care Areas

Germiston Germiston

hot!
Date added: 05/29/2013
Date modified: 05/29/2013
Filesize: 66.94 kB
Downloads: 6114

Load shedding schedules for:

  • Katlehong
  • Germiston Customer Care Areas

Kempton Park Kempton Park

hot!
Date added: 05/29/2013
Date modified: 05/29/2013
Filesize: 71.71 kB
Downloads: 6273

Load shedding schedules for:

  • Kempton Park

Nigel Nigel

hot!
Date added: 05/29/2013
Date modified: 05/29/2013
Filesize: 54.64 kB
Downloads: 1101

Load shedding schedules for:

  • Nigel
  • Springs Customer Care Areas  

Springs Springs

hot!
Date added: 05/29/2013
Date modified: 05/29/2013
Filesize: 54.64 kB
Downloads: 1948

Load shedding schedules for:

  • Nigel
  • Springs Customer Care Areas  

Tembisa Tembisa

hot!
Date added: 05/29/2013
Date modified: 05/29/2013
Filesize: 63.48 kB
Downloads: 1587

Load shedding schedules for:

  • Tembisa