What is Load Shedding?
When there is insufficient power station capacity to supply the demand (load) from all the customers, the electricity system could become unstable, possibly resulting in a national black-out. To avoid this, Eskom can either increase supply or reduce demand.
To increase supply, Eskom will run its power stations at maximum available capacity. In addition to the coal and nuclear plant, hydro and open cycle gas turbine stations are used at peak times when demand is high.
To reduce demand, Eskom will first call on customer contracts that allow for supply to be reduced or interrupted for specific periods and durations. If this is not enough, Eskom is forced to cut supply to all other customers. This could be done through either Scheduled or Emergency Load Shedding.
During Scheduled load shedding parts of the network are switched off according to a predetermined schedule, with the impact spread equitably over the customer base. Shedding is predictable and allows for customers to plan accordingly.
In exceptional circumstances additional Emergency load shedding could be required. Control Centres will shed load using emergency switching in order to protect the network. This will be less predictable and all customers can expect to be affected at any time.
Documents
Tembisa - 2011
| Date added: | 04/01/2011 |
| Date modified: | 05/09/2011 |
| Filesize: | 49.95 kB |
| Downloads: | 1470 |
2011 load shedding schedules for:
- Tembisa
Springs - 2011
| Date added: | 04/01/2011 |
| Date modified: | 05/09/2011 |
| Filesize: | 49.85 kB |
| Downloads: | 1665 |
2011 load shedding schedules for:
- Nigel
- Springs Customer Care Areas
Brakpan - 2011
| Date added: | 04/01/2011 |
| Date modified: | 05/09/2011 |
| Filesize: | 50.59 kB |
| Downloads: | 2047 |
2011 load shedding schedules for:
- Brakpan
- Kwa-Thema Customer Care Areas
Benoni - 2011
| Date added: | 04/01/2011 |
| Date modified: | 05/09/2011 |
| Filesize: | 33.65 kB |
| Downloads: | 2865 |
2011 load shedding schedules for:
- Benoni
Edenvale - 2011
| Date added: | 04/01/2011 |
| Date modified: | 05/09/2011 |
| Filesize: | 51.81 kB |
| Downloads: | 3344 |
2011 load shedding schedules for:
- Edenvale
- Bedfordview Customer Care Areas
Boksburg - 2011
| Date added: | 04/01/2011 |
| Date modified: | 05/09/2011 |
| Filesize: | 51.03 kB |
| Downloads: | 3709 |
2011 load shedding schedules for:
- Boksburg
- Vosloorus Customer Care Areas
Kempton Park - 2011
| Date added: | 04/01/2011 |
| Date modified: | 05/09/2011 |
| Filesize: | 53.87 kB |
| Downloads: | 3775 |
2011 load shedding schedules for:
- Kempton Park
Germiston - 2011
| Date added: | 04/01/2011 |
| Date modified: | 05/09/2011 |
| Filesize: | 50.81 kB |
| Downloads: | 4169 |
2011 load shedding schedules for:
- Katlehong
- Germiston Customer Care Areas
Alberton - 2011
| Date added: | 04/01/2011 |
| Date modified: | 05/09/2011 |
| Filesize: | 52.85 kB |
| Downloads: | 4363 |
2011 load shedding schedules for:
- Alberton
- Thokoza Customer Care Areas