Thursday, May 23, 2013
   
Text Size

Website Search

Load shedding schedules

What is Load Shedding?

When there is insufficient power station capacity to supply the demand (load) from all the customers, the electricity system could become unstable, possibly resulting in a national black-out. To avoid this, Eskom can either increase supply or reduce demand.

To increase supply, Eskom will run its power stations at maximum available capacity. In addition to the coal and nuclear plant, hydro and open cycle gas turbine stations are used at peak times when demand is high.

To reduce demand, Eskom will first call on customer contracts that allow for supply to be reduced or interrupted for specific periods and durations. If this is not enough, Eskom is forced to cut supply to all other customers. This could be done through either Scheduled or Emergency Load Shedding.

During Scheduled load shedding parts of the network are switched off according to a predetermined schedule, with the impact spread equitably over the customer base. Shedding is predictable and allows for customers to plan accordingly.

In exceptional circumstances additional Emergency load shedding could be required. Control Centres will shed load using emergency switching in order to protect the network. This will be less predictable and all customers can expect to be affected at any time.

Documents

Order by : Name | Date | Hits | [ Descendent ]

Tembisa - 2011 Tembisa - 2011

hot!
Date added: 04/01/2011
Date modified: 05/09/2011
Filesize: 49.95 kB
Downloads: 1470

2011 load shedding schedules for:

  • Tembisa

Springs - 2011 Springs - 2011

hot!
Date added: 04/01/2011
Date modified: 05/09/2011
Filesize: 49.85 kB
Downloads: 1665

2011 load shedding schedules for:

  • Nigel
  • Springs Customer Care Areas  

Brakpan - 2011 Brakpan - 2011

hot!
Date added: 04/01/2011
Date modified: 05/09/2011
Filesize: 50.59 kB
Downloads: 2047

2011 load shedding schedules for:

  • Brakpan
  • Kwa-Thema Customer Care Areas

Benoni - 2011 Benoni - 2011

hot!
Date added: 04/01/2011
Date modified: 05/09/2011
Filesize: 33.65 kB
Downloads: 2865

    2011 load shedding schedules for:

    • Benoni

    Edenvale - 2011 Edenvale - 2011

    hot!
    Date added: 04/01/2011
    Date modified: 05/09/2011
    Filesize: 51.81 kB
    Downloads: 3344

    2011 load shedding schedules for:

    • Edenvale
    • Bedfordview Customer Care Areas

    Boksburg - 2011 Boksburg - 2011

    hot!
    Date added: 04/01/2011
    Date modified: 05/09/2011
    Filesize: 51.03 kB
    Downloads: 3709

    2011 load shedding schedules for:

    • Boksburg
    • Vosloorus Customer Care Areas

    Kempton Park - 2011 Kempton Park - 2011

    hot!
    Date added: 04/01/2011
    Date modified: 05/09/2011
    Filesize: 53.87 kB
    Downloads: 3775

    2011 load shedding schedules for:

    • Kempton Park

    Germiston - 2011 Germiston - 2011

    hot!
    Date added: 04/01/2011
    Date modified: 05/09/2011
    Filesize: 50.81 kB
    Downloads: 4169

    2011 load shedding schedules for:

    • Katlehong
    • Germiston Customer Care Areas

    Alberton - 2011 Alberton - 2011

    hot!
    Date added: 04/01/2011
    Date modified: 05/09/2011
    Filesize: 52.85 kB
    Downloads: 4363

      2011 load shedding schedules for:

      • Alberton
      • Thokoza Customer Care Areas