Tenders awarded

2013 – December

PROJECT MANAGER CONTRACT NO DESCRIPTION OF BIDS AWARDED FOR THE MONTH OF NOVEMBER 2012 FINAL DATE SERVED AT BAC SUPPLIER
Alfred Sidia A-RS (R) 09/2013 The Supply delivery and erection of road traffic signs on an as-and-when
required basis –  until 30 June 2016
30-Sep-13 Repro Signs CC
Alfred Sidia A-RS (R) 09/2013 The Supply delivery and erection of road traffic signs on an as-and-when
required basis –  until 30 June 2016
30-Sep-13 Lenas International Investments (Pty) Ltd
t/a Lenash  Signs
Alfred Sidia A-RS (R) 09/2013 The Supply delivery and erection of road traffic signs on an as-and-when
required basis –  until 30 June 2016
30-Sep-13 Megaphase Trading 380 CC t/a
P F Services & Supplies
Ryk de Beer A-DEMS 03/2014 Appointment of a turnkey solution service provider for the repairs and
maintenance of the existing hardware and software in the call taking and
dispatching centres, fire stations and emergency services vehicles
until 30 June 16 
07-Oct-13 Aurecon South Africa (Pty) Ltd
Boineelo Morekisi A-ICT 03/2013 Maintenance of Printers, copiers, scanners and multifunctional devices until
30 June 15 ( Category A Printers)
07-Oct-13 Vuma Technologies CC
Boineelo Morekisi A-ICT 03/2013 Maintenance of Printers, copiers, scanners and multifunctional devices until
30 June 15 (Category B Printers)
07-Oct-13 Dido Digital Document (Pty) Ltd
Dikeledi Booysen/ Anton van Wyk A-RE (FM) 10/2013 Appointment of contractors for the refurbishment o buildings around EMM
on an as-and when required basis – until 30 June 2015 
07-Oct-13 Themba Brick and Steel Structure CC
Dikeledi Booysen/ Anton van Wyk A-RE (FM) 10/2013 Appointment of contractors for the refurbishment o buildings around EMM
on an as-and when required basis – until 30 June 2015 
07-Oct-13 Build-Mat Global-Siya Zama Construction
Dikeledi Booysen/ Anton van Wyk A-RE (FM) 10/2013 Appointment of contractors for the refurbishment o buildings around EMM
on an as-and when required basis – until 30 June 2015 
07-Oct-13 Asatico Civil anmd Consturction
Dikeledi Booysen/ Anton van Wyk A-RE (FM) 10/2013 Appointment of contractors for the refurbishment o buildings around EMM
on an as-and when required basis – until 30 June 2015 
07-Oct-13 New Africa Labour Hire Construction CC
Hennie Esterhuizen A-EE 21/2013 Supply, delivery and installation of new integrated remote controlled electrical
enclosures, substation entrance doors and the repair and maintenance of
existing controlled electrical enclosures as specified within the entire EMM –
as and when until 30 June 16
Sect 1: Alberton, Edenvale. Springs, Tembisa: Section 3: Tembisa
28-Oct-13 Tsala Agricultural Investments (Pty) Ltd
Hennie Esterhuizen A-EE 21/2013 Supply, delivery and installation of new integrated remote controlled electrical
enclosures, substation entrance doors and the repair and maintenance of
existing controlled electrical enclosures as specified within the entire EMM –
as and when until 30 June 16
Sect 1: Boksburg, Brakpan. Sect 2: Brakpan Edenvale;
Section 3: Kempton Park , Edenvale. Sect 4 Kempton Park & Edenvale
28-Oct-13 Tsonga electrical CC
Hennie Esterhuizen A-EE 21/2013 Supply, delivery and installation of new integrated remote controlled electrical
enclosures, substation entrance doors and the repair and maintenance of
existing controlled electrical enclosures as specified within the entire EMM –
as and when until 30 June 16
Sect 1: Germiston. Benoni; Sect 2 Springs, Germiston:
Sect 3 Alberton, Brakpan, Benoni, Boksburg Germiston,
Springs. Sect 4 Alberton. Brakpan, Benoni. Boksburg, Germiston,
Springs. Sect 5 Alberton, Brakpan, Benoni, Boksburg, Germiston,
Springs Sect 6: Alberton, Brakpan, Benoni, Boksburg, Germiston,
Springs
28-Oct-13 Protective Structures (Pty) Ltd
Hennie Esterhuizen A-EE 21/2013 Supply, delivery and installation of new integrated remote controlled electrical
enclosures, substation entrance doors and the repair and maintenance of
existing controlled electrical enclosures as specified within the entire EMM –
as and when until 30 June 16
Sect 1: Kempton Park. Sect 2: Benoni, Alberton, Boksburg,
Kempton Park. Sect 5 Kempton Park, Edenvale.
Sect 6 Kempton Park, Edenvale
28-Oct-13 KopanoYA Basebetsi BA Afrika
Hennie Esterhuizen A-EE 21/2013 Supply, delivery and installation of new integrated remote controlled electrical
enclosures, substation entrance doors and the repair and maintenance of
existing controlled electrical enclosures as specified within the entire EMM –
as and when until 30 June 16
Sect 6: Tembisa
28-Oct-13 Halo Electrical (Pty) Ltd
Johann Gertzen  A-HS 03/2013 Appointment of Main Building contractors to manager small community builders
for the construction of Approx. 9966 subsidized houses – 1 July 2013 until 30 June 2016
28-Oct-13 Urban Dynamics Gauteng Inc
Johann Gertzen  A-HS 03/2013 Appointment of Main Building contractors to manager small community builders
for the construction of Approx. 9966 subsidized houses – 1 July 2013 until 30 June 2016
28-Oct-13
P.M.A. Housing & Civils (Pty) Ltd
Johann Gertzen  A-HS 03/2013 Appointment of Main Building contractors to manager small community builders
for the construction of Approx. 9966 subsidized houses – 1 July 2013 until 30 June 2016
28-Oct-13 Motheo Construction Group (Pty) Ltd
Johann Gertzen  A-HS 03/2013 Appointment of Main Building contractors to manager small community builders
for the construction of Approx. 9966 subsidized houses – 1 July 2013 until 30 June 2016
28-Oct-13 Metroprojects Development (Pty) Ltd
Johann Gertzen  A-HS 03/2013 Appointment of Main Building contractors to manager small community builders
for the construction of Approx. 9966 subsidized houses – 1 July 2013 until 30 June 2016
28-Oct-13 Bankuna Engineerign and Construction
CC
Johann Gertzen  A-HS 03/2013 Appointment of Main Building contractors to manager small community builders
for the construction of Approx. 9966 subsidized houses – 1 July 2013 until 30 June 2016
28-Oct-13 Mellon Housing Initiative
Irene Sithole
Rico Reynecke
SRAC 11/2013 Construction of a new library on Erf 3266 Brakpan:
Withdrawal of appointment dated 12 Aug 2013
28-Oct-13 CV Shopfitters & Joiners CC
Irene Sithole
Rico Reynecke
SRAC 11/2013 Construction of a new library on Erf 3266 Brakpan and subsequent award  28-Oct-13 Khuboni Civil  Projects (Pty) Ltd
Thuthuka Mathe A-F 14/2013 Appointment of a debt collection agency -as and when – until 30 June 16-
but awarded only until 30 June 2015
South-West Area: Germiston
28-Oct-13 Bizworks (Pty) Ltd
Thuthuka Mathe A-F 14/2013 Appointment of a debt collection agency -as and when – until 30 June 16 –
but awarded only until 30 June 2015
South-West Area: Boksburg
28-Oct-13 Kwinana Consortium
Thuthuka Mathe A-F 14/2013 Appointment of a debt collection agency -as and when – until 30 June 16 –
but awarded only until 30 June 2015
North-East Area: Kempton Park, Tembisa and Edenvale
28-Oct-13 Medaco Gauteng (Pty) Ltd
Thuthuka Mathe A-F 14/2013 Appointment of a debt collection agency -as and when – until 30 June 16 –
but awarded only until 30 June 2015
South-West Area: Alberton
28-Oct-13 Joint Venture Bham and Dhaya Attorneys
and Bham and Dhaya CC
Thuthuka Mathe A-F 14/2013 Appointment of a debt collection agency -as and when – until 30 June 16 –
but awarded only until 30 June 2015: South-West: Boksburg
28-Oct-13 Joint Venture Saras Sagathevan Attorneys
and Ismail and Dhaya Attorneys
Thuthuka Mathe A-F 14/2013 Appointment of a debt collection agency -as and when – until 30 June 16 –
but awarded only until 30 June 2015
North-East Area: Springs. Brakpan, Nigel
28-Oct-13 Debt-In Prograce Investments JV
Thuthuka Mathe A-F 14/2013 Appointment of a debt collection agency -as and when – until 30 June 16
but awarded only until 30 June 2015
North-East Area: Springs. Brakpan, Nigel
28-Oct-13 In-Quest Investigations (pty) Ltd
Thuthuka Mathe A-F 14/2013 Appointment of a debt collection agency -as and when – until 30 June 16 –
but awarded only until 30 June 2015
South-West Area: Germiston
28-Oct-13 Van der Venter Mojapelo (Pty) Ltd
Thuthuka Mathe A-F 14/2013 Appointment of a debt collection agency -as and when – until 30 June 16 –
but awarded only until 30 June 2015
North-East Area: Benoni
28-Oct-13 NuDebt Management (Pty) Ltd
Thuthuka Mathe A-F 14/2013 Appointment of a debt collection agency -as and when – until 30 June 16 –
but awarded only until 30 June 2015
South-West Area: Alberton
28-Oct-13 Matsimela & Associates
Thuthuka Mathe A-F 14/2013 Appointment of a debt collection agency -as and when – until 30 June 16 –
but awarded only until 30 June 2015
North East Area – Kempton Park, Tembisa, Edenvale
28-Oct-13 Imani Business Advisory Services (Pty) Ltd
JV Norton Lambrianos
Thuthuka Mathe A-F 14/2013 Appointment of a debt collection agency -as and when – until 30 June 16 –
but awarded only until 30 June 2015
South-West Area: Germiston
28-Oct-13 Revenue Consulting (Pty) Ltd
Thuthuka Mathe A-F 14/2013 Appointment of a debt collection agency -as and when – until 30 June 16 –
but awarded only until 30 June 2015
North-East Area: Benoni
28-Oct-13 IDP Tracing Services (pty) Ltd
Thuthuka Mathe A-F 14/2013 Appointment of a debt collection agency -as and when – until 30 June 16 –
but awarded only until 30 June 2015
South-West Area: Boksburg
28-Oct-13 Phakamani Debt Collection Services
Innocent Mulaudzi EE 11/2013 Appointment of contractors for the electrification of Mayfield Ext 1 . 04-Nov-13 Zizwe General Swervices CC
Innocent Mulaudzi EE 11/2013 Appointment of contractors for the electrification of Mayfield Ext 1  04-Nov-13 Malesela Transmission and
Distribution (Pty) Ltd
Innocent Mulaudzi EE 11/2013 Appointment of contractors for the electrification of Mayfield Ext 1  04-Nov-13 Raphahlelo and Associatates CC
t/a F and J electrical
Is'haaq Akoon PS-ED (PP) 05/2011 Development of a climate change vulnerability and adaptation model 04-Nov-13 NON AWARD
VALIDITY PERIOD LAPSED
Toekie Tieghi
Thabo Khanye
  Bids, quotations and deviations for September 2013 04-Nov-13 TO BE NOTED
Carol Manyashi A-HR 03/2012 To conduct baseline hearing screening tests on employees ex[posed to noise
levels  > 85 decibels until 30 June 15
04-Nov-13 NON AWARD
VALIDITY PERIOD LAPSED
Jaco Brits PS-HEA 78/2013 Architects with a professional team to manage and supervise the construction
of the new Selope Thema Clinic based on standard documentation provided 
04-Nov-13 Naren Mistry Architects Gauteng t/a
The Creative Axis Architects
Jaco Brits PS-HEA 83/2013 Architects to manage and supervise the construction of the new Esangweni clinic 04-Nov-13 Kwpcreate (Pty) Ltd
Herman Steyn PS-ICT 47/2013 Design and implantation of an electronic documents and records management
solution until 30 June 15
04-Nov-13 NON AWARD
CHANGE IN DEPT STRATEGY
Tsebang Moeti A-ICT 04-2011 Supply, delivery, installation, deployment, management, reporting and maintenance
of a comprehensive enterprise antivirus solution until 30 June 2013
04-Nov-13 NON AWARD
CHANGE IN DEPT STRATEGY
Rico Reyneke SRAC 05/2013 Amendment of resolution:  Repair and rehabilitation of Alrapark Swimming Pool 04-Nov-13 Puledi Engineerign and Construction CC
Change in recommendation re escalation
and contingencies
Rico Reyneke SRAC 15/2013 Amendment of resolution: Rehabilitation of Benoni Central Swimming Pool 04-Nov-13 El-Sha Consulting (Pty) Ltd
Nick Moela PS-WMS 22/2013 The appointment of environmental consultant to develop a 2030 master plan for the
establishment of public off-loading facilities 
04-Nov-13 NON AWARD
FLAWED SPECIFICATIONS
Edwin Morulane IS (WS)  02/2012  Installation of bulk water supply for new developments in Dawn Park, Boksburg 04-Nov-13 NON AWARD
VALIDITY PERIOD LAPSED
Johan Vorster
John McLean
A-WS 02-2013 Supply, delivery and off-loading of various sizes of water meters and other material
as-and-when – until 30 June 15                         Change in recommendation
04-Nov-13 Elster Kent Metering (Pty) Ltd
Change in recommendation: price decrease
Edwin Morulane IS (WS) 10/2012 Replace and repair outfall sewer in Dawn Park Boksburg 04-Nov-13 NON AWARDE
VALIDITY PERIOD LAPSED
Francois Meyer IS (CW) 34/2011 Additional contingencies – repair Katlehong Swimming pool 04-Nov-13 Saxon Developments CC
Mary Lekgau A-CS (DEMS) 20/2012 Supply, delivery and off-loading of protective clothing for emergency services  personnel –  as and when until 30 June 15 11-Nov-13 NON AWARD
VALIDITY PERIOD LAPSED
Hennie Marx A-EE 11/2013 Daily management of a standardised and centralise asset care centre and maintenance and refurbishment plan u until 30 June 16 11-Nov-13 CANCELLED
CHANGE IN DEPARTMENTAL STRATEGY
Maabeane Matjokotha
Bongani Nkambule
EE 07/2013 Appointment of a contractor for the upgrade of Edenvale Industries 6.6 kV switching station 11-Nov-13 Powertech SA (Pty) Ltd t/a
Pwertech IST
Maabeane Matjokotha
Bongani Nkambule
EE 04/2013 Appointment of a contractor for the upgrade of Edenvale Munic Substation 11-Nov-13 Bafune Construction and electrical CC
Renier Cooper ED (MP) 08/2012 Construction of Nyoni Park Phase 2 11-Nov-13 NON AWARD
VALIDITY PERIOD LAPSED AND
REGULTORY REQUIREMENTS
Themba Tshabalala
Dave Renke
F 01/2013 Additions and alterations to an existing office building at Germiston Stores, Driehoek 11-Nov-13 Mabra Construction (Pty) Ltd
Jaco Brits HEA 04/2013 Construction of the new Villa Liza clinic (Level 2) 11-Nov-13 BP Masanabo Construction CC
Marlene Theron A-RE (BM) 01/2013 Electrical maintenance – as and when – until 30 June 15 11-Nov-13 NON AWARD
VALIDITY PERIOD LAPSED
Hennie Spies A-RS (R)  05/2013 The maintenance of private railway sidings – as and when – until 30 June 15 11-Nov-13 NON AWARD
VALIDITY PERIOD LAPSED
Andre Human A-WMS 10/2013 The manufacture, supply, delivery, distribution of new 240 litre refuse bins – as and when
until 30 June 16
11-Nov-13 Phambili Services (Pty) Ltd
Andre Human A-WMS 10/2013 The manufacture, supply, delivery, distribution of new 240 litre refuse bins – as and when
until 30 June 16 
11-Nov-13 Glowax (pty) Ltd
Edwin Morulane IS (WS) 20/2012 The appointment of a contractor for the construction of a bulk water pipeline from
Rand Water connection to Palm Ridge Reservoir, Katlheong 2
11-Nov-13 NON AWARD
NON ACCEPTANCE BY AWARDED
BIDDER
Siphiwe Dube
Edwin Morulane
IS (WS) 12/2012 Construction of a pre-stressed 35Ml concrete reservoir in Palm Ridge, Katlehong 2 11-Nov-13 NON AWARD
VALIDITY PERIOD LAPSED
Sandile Nonjiji
Ryno v Vuren
A-F (FM) 12/2013 Supply, delivery and commissioning of fire fighting vehicles by means of outright purchase on an-as-and when required basis from date of award until 30 June 2016 –
Correction of recommendation
11-Nov-13 Correction of  Recommendation
Morongwa
Tsebe
A-CM 01/2013 Designing, manufacturing, printing, installation and maintenance of branding signage
on the municipal buildings, along municipal road reserves and along freeways within the municipal boundaries – as and when – until 30 June 15
18-Nov-13 NON AWARD
FLAWED SPECIFICATIONS &
BID TECHNICALLY LAPSED
Bongani
Nkambule
A-EE 20/2013 Supply, delivery and off-loading of circuit breakers as and when until 30 June 2016 18-Nov-13 Imbani Procurement Solutions (Pty) Ltd
Bongani
Nkambule
A-EE 20/2013 Supply, delivery and off-loading of circuit breakers as and when until 30 June 2016 18-Nov-13 Jupiter Electrical Wholesalers CC
Bongani
Nkambule
A-EE 20/2013 Supply, delivery and off-loading of circuit breakers as and when until 30 June 2016 18-Nov-13 Nerm Application and Testing (Pty) Ltd
Bongani
Nkambule
A-EE 20/2013 Supply, delivery and off-loading of circuit breakers as and when until 30 June 2016 18-Nov-13 Voltsing electrical (Pty) Ltd
Archie Futshane ICT 01/2012 Appointment of a transaction advisor for the digital city services regarding a
commercial, legal and regulatory advisor work
18-Nov-13 NON AWARD
No acceptable bids
Louis Esterhuizen
Johan Ruhling
IS (CW) 26/2009 Construction of drivers licence testing centre in Nigel 18-Nov-13 CANCELLATION
BID TECHNICALLY LAPSED
Louis Esterhuizen
Johan Ruhling
IS (CW) 25/2009 Construction of drivers licence testing centre in Benoni 18-Nov-13 CANCELLATION
BID TECHNICALLY LAPSED
Edwin Morulane PS-WS 39/2013 Appointment of consulting engineers for professional engineering services for
various projects in the multi year budgets until 30 June 15
18-Nov-13 Civec Civil Engineering Consultants CC
Edwin Morulane PS-WS 39/2013 Appointment of consulting engineers for professional engineering services for
various projects in the multi year budgets until 30 June 15
18-Nov-13 Seasons Find 1287 CC t/a
Epitome Consulting CC
Edwin Morulane PS-WS 39/2013 Appointment of consulting engineers for professional engineering services for
various projects in the multi year budgets until 30 June 15
18-Nov-13 Tsekema Consulting Engineers ([Pty) Ltd
Amanda
Malhabathe
A-RE (BM) 04/2013 General building maintenance – as and when – until 30 June 15  18-Nov-13 Maitemolatelo Business Enterprise CC
Amanda
Malhabathe
A-RE (BM) 04/2013 General building maintenance – as and when – until 30 June 15  18-Nov-13 L Ram Civil and Construction CC
Amanda
Malhabathe
A-RE (BM) 04/2013 General building maintenance – as and when – until 30 June 15  18-Nov-13 Maseno General Trading and Makhabaludaka JV
Tsabang Moeti A-ICT 05/2013 Supply, delivery, installation, deployment, management, reporting and maintenance
of a comprehensive enterprise endpoint protection solution – as and when – until 30 June 16
18-Nov-13 Suite Origins (pty) Ltd t/a Origin Consulting
Tsabang Moeti A-ICT 05/2013 Supply, delivery, installation, deployment, management, reporting and maintenance of a
comprehensive enterprise endpoint protection solution – as and when – until 30 June 16
18-Nov-13
Dynamic Recovery Services (Pty) Ltd
Thomas Sema A-PT 03/2014 Supply, delivery and installation of paly detector machines as prescribed by the National
Road Traffic Act Vol II Act 93 of 1996 as amended and SANS 10216 specifications at
various testing stations until 30 June 16
25-Nov-13 Workshop Electronics CC
Reggie Mabogoane PS-SRAC 01/2014 Appointment of a service provider to manage the OR Tambo cultural precinct –
including building management, maintenance, marketing and the delivery of
cultural programs until 30 June 16
25-Nov-13 NON AWARD
NO ACCEPTABLE BIDS