2013 – November
PROJECT MANAGER | CONTRACT NO | DESCRIPTION OF BIDS AWARDED FOR THE MONTH OF NOVEMBER 2012 | FINAL DATE SERVED AT BAC | SUPPLIER | ESTIMATED AMOUNT |
---|---|---|---|---|---|
Alfred Sidia | A-RS (R) 09/2013 |
The Supply delivery and erection of road traffic signs on an as-and-when required basis – until 30 June 2016 |
30-Sep-13 | Repro Signs CC | R 2 915 480.00 |
Alfred Sidia | A-RS (R) 09/2013 |
The Supply delivery and erection of road traffic signs on an as-and-when required basis – until 30 June 2016 |
30-Sep-13 |
Lenas International Investments (Pty) Ltd t/a Lenash Signs |
R 2 915 480.00 |
Alfred Sidia | A-RS (R) 09/2013 |
The Supply delivery and erection of road traffic signs on an as-and-when required basis – until 30 June 2016 |
30-Sep-13 |
Megaphase Trading 380 CC t/a P F Services & Supplies |
R 2 915 480.00 |
Ryk de Beer | A-DEMS 03/2014 |
Appointment of a turnkey solution service provider for the repairs and maintenance of the existing hardware and software in the call taking and dispatching centres, fire stations and emergency services vehicles until 30 June 16 |
07-Oct-13 | Aurecon South Africa (Pty) Ltd | R 7 779 470.00 |
Boineelo Morekisi | A-ICT 03/2013 |
Maintenance of Printers, copiers, scanners and multifunctional devices until 30 June 15 ( Category A Printers) |
07-Oct-13 | Vuma Technologies CC | R 4 410 000.00 |
Boineelo Morekisi | A-ICT 03/2013 |
Maintenance of Printers, copiers, scanners and multifunctional devices until 30 June 15 (Category B Printers) |
07-Oct-13 | Dido Digital Document (Pty) Ltd | R 8 400 000.00 |
Dikeledi Booysen/ Anton van Wyk | A-RE (FM) 10/2013 |
Appointment of contractors for the refurbishment o buildings around EMM on an as-and when required basis – until 30 June 2015 |
07-Oct-13 | Themba Brick and Steel Structure CC | R 25 000 000.00 |
Dikeledi Booysen/ Anton van Wyk | A-RE (FM) 10/2013 |
Appointment of contractors for the refurbishment o buildings around EMM on an as-and when required basis – until 30 June 2015 |
07-Oct-13 | Build-Mat Global-Siya Zama Construction | R 25 000 000.00 |
Dikeledi Booysen/ Anton van Wyk | A-RE (FM) 10/2013 |
Appointment of contractors for the refurbishment o buildings around EMM on an as-and when required basis – until 30 June 2015 |
07-Oct-13 | Asatico Civil and Consturction | R 25 000 000.00 |
Dikeledi Booysen/ Anton van Wyk | A-RE (FM) 10/2013 |
Appointment of contractors for the refurbishment o buildings around EMM on an as-and when required basis – until 30 June 2015 |
07-Oct-13 | New Africa Labour Hire Construction CC | R 25 000 000.00 |
Hennie Esterhuizen | A-EE 21/2013 |
Supply, delivery and installation of new integrated remote controlled electrical enclosures, substation entrance doors and the repair and maintenance of existing controlled electrical enclosures as specified within the entire EMM – as and when until 30 June 16 Sect 1: Alberton, Edenvale. Springs, Tembisa: Section 3: Tembisa |
28-Oct-13 | Tsala Agricultural Investments (Pty) Ltd | R 6 944 450.00 |
Hennie Esterhuizen | A-EE 21/2013 |
Supply, delivery and installation of new integrated remote controlled electrical enclosures, substation entrance doors and the repair and maintenance of existing controlled electrical enclosures as specified within the entire EMM – as and when until 30 June 16 Sect 1: Boksburg, Brakpan. Sect 2: Brakpan Edenvale; Section 3: Kempton Park , Edenvale. Sect 4 Kempton Park & Edenvale |
28-Oct-13 | Tsonga electrical CC | R 11 111 120.00 |
Hennie Esterhuizen | A-EE 21/2013 |
Supply, delivery and installation of new integrated remote controlled electrical enclosures, substation entrance doors and the repair and maintenance of existing controlled electrical enclosures as specified within the entire EMM – as and when until 30 June 16 Sect 1: Germiston. Benoni; Sect 2 Springs, Germiston: Sect 3 Alberton, Brakpan, Benoni, Boksburg Germiston, Springs. Sect 4 Alberton. Brakpan, Benoni. Boksburg, Germiston, Springs. Sect 5 Alberton, Brakpan, Benoni, Boksburg, Germiston, Springs Sect 6: Alberton, Brakpan, Benoni, Boksburg, Germiston, Springs |
28-Oct-13 | Protective Structures (Pty) Ltd | R 38 888 920.00 |
Hennie Esterhuizen | A-EE 21/2013 |
Supply, delivery and installation of new integrated remote controlled electrical enclosures, substation entrance doors and the repair and maintenance of existing controlled electrical enclosures as specified within the entire EMM – as and when until 30 June 16 Sect 1: Kempton Park. Sect 2: Benoni, Alberton, Boksburg, Kempton Park. Sect 5 Kempton Park, Edenvale. Sect 6 Kempton Park, Edenvale |
28-Oct-13 | KopanoYA Basebetsi BA Afrika | R 12 500 000.00 |
Hennie Esterhuizen | A-EE 21/2013 |
Supply, delivery and installation of new integrated remote controlled electrical enclosures, substation entrance doors and the repair and maintenance of existing controlled electrical enclosures as specified within the entire EMM – as and when until 30 June 16 Sect 6: Tembisa |
28-Oct-13 | Halo Electrical (Pty) Ltd | R 1 388 890.00 |
Johann Gertzen | A-HS 03/2013 |
Appointment of Main Building contractors to manager small community builders for the construction of Approx. 9966 subsidized houses – 1 July 2013 until 30 June 2016 |
28-Oct-13 | Urban Dynamics Gauteng Inc | DORA FUNDING |
Johann Gertzen | A-HS 03/2013 |
Appointment of Main Building contractors to manager small community builders for the construction of Approx. 9966 subsidized houses – 1 July 2013 until 30 June 2016 |
28-Oct-13 |
P.M.A. Housing & Civils (Pty) Ltd |
DORA FUNDING |
Johann Gertzen | A-HS 03/2013 |
Appointment of Main Building contractors to manager small community builders for the construction of Approx. 9966 subsidized houses – 1 July 2013 until 30 June 2016 |
28-Oct-13 | Motheo Construction Group (Pty) Ltd | DORA FUNDING |
Johann Gertzen | A-HS 03/2013 |
Appointment of Main Building contractors to manager small community builders for the construction of Approx. 9966 subsidized houses – 1 July 2013 until 30 June 2016 |
28-Oct-13 | Metroprojects Development (Pty) Ltd | DORA FUNDING |
Johann Gertzen | A-HS 03/2013 |
Appointment of Main Building contractors to manager small community builders for the construction of Approx. 9966 subsidized houses – 1 July 2013 until 30 June 2016 |
28-Oct-13 |
Bankuna Engineerign and Construction CC |
DORA FUNDING |
Johann Gertzen | A-HS 03/2013 |
Appointment of Main Building contractors to manager small community builders for the construction of Approx. 9966 subsidized houses – 1 July 2013 until 30 June 2016 |
28-Oct-13 | Mellon Housing Initiative | DORA FUNDING |
Irene Sithole Rico Reynecke |
SRAC 11/2013 |
Construction of a new library on Erf 3266 Brakpan: Withdrawl of appointment dated 12 Aug 2013 |
28-Oct-13 | CV Shopfitters & Joiners CC: WITHDRAWAL | R 0.00 |
Irene Sithole Rico Reynecke |
SRAC 11/2013 | Construction of a new library on Erf 3266 Brakpan and subsequint award | 28-Oct-13 | Khuboni Civil Projects (Pty) Ltd | R 14 455 075.18 |
Thuthuka Mathe | A-F 14/2013 |
Appointment of a debt collection agency -as and when – until 30 June 16- but awarded only until 30 June 2015 South-West Area: Germiston |
28-Oct-13 | Bizworks (Pty) Ltd | R 8 432 000.00 |
Thuthuka Mathe | A-F 14/2013 |
Appointment of a debt collection agency -as and when – until 30 June 16 – but awarded only until 30 June 2015 South-West Area: Boksburg |
28-Oct-13 | Kwinana Consortium | R 3 372 800.00 |
Thuthuka Mathe | A-F 14/2013 |
Appointment of a debt collection agency -as and when – until 30 June 16 – but awarded only until 30 June 2015 North-East Area: Kempton Park, Tembisa and Edenvale |
28-Oct-13 | Medaco Gauteng (Pty) Ltd | R 8 633 239.00 |
Thuthuka Mathe | A-F 14/2013 |
Appointment of a debt collection agency -as and when – until 30 June 16 – but awarded only until 30 June 2015 South-West Area: Alberton |
28-Oct-13 |
Joint Venture Bham and Dhaya Attorneys and Bham and Dhaya CC |
R 4 268 700.00 |
Thuthuka Mathe | A-F 14/2013 |
Appointment of a debt collection agency -as and when – until 30 June 16 – but awarded only until 30 June 2015: South-West: Boksburg |
28-Oct-13 |
Joint Venture Saras Sagathevan Attorneys and Ismail and Dhaya Attorneys |
R 3 372 800.00 |
Thuthuka Mathe | A-F 14/2013 |
Appointment of a debt collection agency -as and when – until 30 June 16 – but awarded only until 30 June 2015 Nort-East Area: Springs. Brakpan, Nigel |
28-Oct-13 | Debt-In Prograce Investments JV | R 10 276 500.00 |
Thuthuka Mathe | A-F 14/2013 |
Appointment of a debt collection agency -as and when – until 30 June 16 but awarded only until 30 June 2015 Nort-East Area: Springs. Brakpan, Nigel |
28-Oct-13 | In-Quest Investigations (pty) Ltd | R 10 276 500.00 |
Thuthuka Mathe | A-F 14/2013 |
Appointment of a debt collection agency -as and when – until 30 June 16 – but awarded only until 30 June 2015 South-West Area: Germiston |
28-Oct-13 | Van der Venter Mojapelo (Pty) Ltd | R 8 432 000.00 |
Thuthuka Mathe | A-F 14/2013 |
Appointment of a debt collection agency -as and when – until 30 June 16 – but awarded only until 30 June 2015 North-East Area: Benoni |
28-Oct-13 | NuDebt Management (Pty) Ltd | R 1 897 200.00 |
Thuthuka Mathe | A-F 14/2013 |
Appointment of a debt collection agency -as and when – until 30 June 16 – but awarded only until 30 June 2015 South-West Area: Alberton |
28-Oct-13 | Matsimela & Associates | R 4 268 700.00 |
Thuthuka Mathe | A-F 14/2013 |
Appointment of a debt collection agency -as and when – until 30 June 16 – but awarded only until 30 June 2015 North East Area – Kempton Park, Tembisa, Edenvale |
28-Oct-13 |
Imani Business Advisory Services (Pty) Ltd JV Norton Lambrianos |
R 8 633 239.00 |
Thuthuka Mathe | A-F 14/2013 |
Appointment of a debt collection agency -as and when – until 30 June 16 – but awarded only until 30 June 2015 South-West Area: Germiston |
28-Oct-13 | Revenue Consulting (Pty) Ltd | R 8 432 000.00 |
Thuthuka Mathe | A-F 14/2013 |
Appointment of a debt collection agency -as and when – until 30 June 16 – but awarded only until 30 June 2015 North-East Area: Benoni |
28-Oct-13 | IDP Tracing Services (pty) Ltd | R 1 897 200.00 |
Thuthuka Mathe | A-F 14/2013 |
Appointment of a debt collection agency -as and when – until 30 June 16 – but awarded only until 30 June 2015 South-West Area: Boksburg |
28-Oct-13 | Phakamani Debt Collection Services | R 3 372 800.00 |
Innocent Mulaudzi | EE 11/2013 | Appointment of contractors for the electrification of Mayfield Ext 1 . | 04-Nov-13 | Zizwe General Swervices CC | R 12 949 432.53 |
Innocent Mulaudzi | EE 11/2013 | Appointment of contractors for the electrification of Mayfield Ext 1 | 04-Nov-13 |
Malesela Transmission and Distribution (Pty) Ltd |
R 10 355 163.00 |
Innocent Mulaudzi | EE 11/2013 | Appointment of contractors for the electrification of Mayfield Ext 1 | 04-Nov-13 |
Raphahlelo and Associatates CC t/a F and J electrical |
R 12 668 952.40 |
Is'haaq Akoon | PS-ED (PP) 05/2011 | Development of a climate change vulnerability and adaptation model | 04-Nov-13 |
NON AWARD VALIDITY PERIOD LAPSED |
R 0.00 |
Toekie Tieghi Thabo Khanye |
Bids, quotations and deviations for September 2013 | 04-Nov-13 | TO BE NOTED | R 0.00 | |
Carol Manyashi | A-HR 03/2012 |
To conduct baseline hearing screening tests on employees ex[posed to noise levels > 85 decibels until 30 June 15 |
04-Nov-13 |
NON AWARD VALIDITY PERIOD LAPSED |
R 0.00 |
Jaco Brits | PS-HEA 78/2013 |
Architects with a professional team to manage and supervise the construction of the new Selope Thema Clinic based on standard documentation provided |
04-Nov-13 |
Naren Mistry Architects Gauteng t/a The Creative Axis Architects |
R 1 181 250.00 |
Jaco Brits | PS-HEA 83/2013 | Architects to manage and supervise the construction of the new Esangweni clinic | 04-Nov-13 | Kwpcreate (Pty) Ltd | R 1 296 016.00 |
Herman Steyn | PS-ICT 47/2013 |
Design and implantation of an electronic documents and records management solution until 30 June 15 |
04-Nov-13 |
NON AWARD CHANGE IN DEPT STRATEGY |
R 0.00 |
Tsebang Moeti | A-ICT 04-2011 |
Supply, delivery, instllation, deployment, management, reporting and maintenance of a comprehensive enterprise antivirus solution until 30 june 2013 |
04-Nov-13 |
NON AWARD CHANGE IN DEPT STRATEGY |
R 0.00 |
Rico Reyneke | SRAC 05/2013 | Amendment of resolution: Repair and rehabilitation of Alrapark Swimming Pool | 04-Nov-13 |
Puledi Engineerign and Construction CC Change in recommendation re escalation and contingencies |
R 0.00 |
Rico Reyneke | SRAC 15/2013 | Amendment of resolution: Rehabilitation of Benoni Central Swimming Pool | 04-Nov-13 | El-Sha Consulting (Pty) Ltd | R 0.00 |
Nick Moela | PS-WMS 22/2013 |
The appointment of environmental consultant to develop a 2030 master plan for the establishment of public off-loading facilities |
04-Nov-13 |
NON AWARD FLAWED SPECIFICATIONS |
R 0.00 |
Edwin Morulane | IS (WS) 02/2012 | Installation of bulk water supply for new developments in Dawn Park, Boksburg | 04-Nov-13 |
NON AWARD VALIDITY PERIOD LAPSED |
R 0.00 |
Johan Vorster John McLean |
A-WS 02-2013 |
Supply, delivery and off-loading of various sizes of water meters and other material as-and-when – until 30 June 15 Change in recommendation |
04-Nov-13 |
Elster Kent Metering (Pty) Ltd Change in recommendation: price decrease |
R 0.00 |
Edwin Morulane | IS (WS) 10/2012 | Replace and repair ourfall sewer in Dawn Park Boksburg | 04-Nov-13 |
NON AWARDED VALIDITY PERIOD LAPSED |
R 0.00 |
Francois Meyer | IS (CW) 34/2011 | Additional contingencies – repair Katlehong Swimming pool | 04-Nov-13 | Saxon Developments CC | R 2 552 621.00 |
Mary Lekgau | A-CS (DEMS) 20/2012 | Supply, delivery and off-loading of protective clothing for emergency services personnel – as and when until 30 June 15 | 11-Nov-13 |
NON AWARD VALIDITY PERIOD LAPSED |
R 0.00 |
Hennie Marx | A-EE 11/2013 | Daily management of a standardised and centralise asset care centre and maintenance and refurbishment plan u until 30 June 16 | 11-Nov-13 |
CANCELLED CHANGE IN DEPARTMENTAL STRATEGY |
R 0.00 |
Maabeane Matjokotha Bongani Nkambule |
EE 07/2013 | Appointment of a contractor for the upgrade of Edenvale Industries 6.6 kV switching station | 11-Nov-13 |
Powertech SA (Pty) Ltd t/a Pwertech IST |
R 17 293 688.92 |
Maabeane Matjokotha Bongani Nkambule |
EE 04/2013 | Appointment of a contractor for the upgrade of Edenvale Munic Substation | 11-Nov-13 | Bafune Construction and electrical CC | R 14 240 633.50 |
Renier Cooper | ED (MP) 08/2012 | Construction of Nyoni Park Phase 2 | 11-Nov-13 |
NON AWARD VALIDITY PERIOD LAPSED AND REGULTORY REQUIREMENTS |
R 0.00 |
Themba Tshabalala Dave Renke |
F 01/2013 | Additions and alterations to an existing office building at Germiston Stores, Driehoek | 11-Nov-13 | Mabra Construction (Pty) Ltd | R 12 178 256.87 |
Jaco Brits | HEA 04/2013 | Construction of the new Villa Liza clinic (Level 2) | 11-Nov-13 | BP Masanabo Construction CC | R 16 396 019.62 |
Marlene Theron | A-RE (BM) 01/2013 | Electrical maintenance – as and when – until 30 June 15 | 11-Nov-13 |
NON AWARD VALIDITY PERIOD LAPSED |
R 0.00 |
Hennie Spies | A-RS (R) 05/2013 | The maintenance of private railway sidings – as and when – until 30 June 15 | 11-Nov-13 |
NON AWARD VALIDITY PERIOD LAPSED |
R 0.00 |
Andre Human | A-WMS 10/2013 |
The manufacture, supply, delivery, distribution of new 240 litre refuse bins – as and when until 30 June 16 |
11-Nov-13 | Phambili Services (Pty) Ltd | R 54 047 900.00 |
Andre Human | A-WMS 10/2013 |
The manufacture, supply, delivery, distribution of new 240 litre refuse bins – as and when until 30 June 16 |
11-Nov-13 | Glowax (pty) Ltd | R 1 563 840.00 |
Edwin Morulane | IS (WS) 20/2012 |
The appointment of a contractor for the construction of a bulk water pipeline from Rand Water connection to Palm Ridge Reservoir, Katlheong 2 |
11-Nov-13 |
NON AWARD NON ACCEPTANCE BY AWARDED BIDDER |
R 0.00 |
Siphiwe Dube Edwin Morulane |
IS (WS) 12/2012 | Construction of a pre-stressed 35Ml concrete reservoir in Palm Ridge, Katlehong 2 | 11-Nov-13 |
NON AWARD VALIDITY PERIOD LAPSED |
R 0.00 |
Morongwa Tsebe |
A-CM 01/2013 |
Designing, manufacturing, printing, installation and maintenance of branding signage on the municipal buildings, along municipal road reserves and along freeways within the municipal boundaries – as and when – until 30 June 15 |
18-Nov-13 |
NON AWARD FLAWED SPECIFICATIONS & BID TECHNICALLY LAPSED |
R 0.00 |
Bongani Nkambule |
A-EE 20/2013 | Supply, delivery and off-loading of circuit breakers as and when until 30 June 2016 | 18-Nov-13 | Imbani Procurement Solutions (Pty) Ltd | R 94 300.00 |
Bongani Nkambule |
A-EE 20/2013 | Supply, delivery and off-loading of circuit breakers as and when until 30 June 2016 | 18-Nov-13 | Jupiter Electrical Wholesalers CC | R 1 821 000.00 |
Bongani Nkambule |
A-EE 20/2013 | Supply, delivery and off-loading of circuit breakers as and when until 30 June 2016 | 18-Nov-13 | Nerm Application and Testing (Pty) Ltd | R 34 800.00 |
Bongani Nkambule |
A-EE 20/2013 | Supply, delivery and off-loading of circuit breakers as and when until 30 June 2016 | 18-Nov-13 | Voltsing electrical (Pty) Ltd | R 4 050 000.00 |
Archie Futshane | ICT 01/2012 |
Appointment of a transaction advisor for the digital city services regarding a commercial, legal and regulatory advisor work |
18-Nov-13 |
NON AWARD No acceptable bids |
R 0.00 |
Louis Esterhuizen Johan Ruhling |
IS (CW) 26/2009 | Construction of drivers licence testing centre in Nigel | 18-Nov-13 |
CANCELLATION BID TECHNICALLY LAPSED |
R 0.00 |
Louis Esterhuizen Johan Ruhling |
IS (CW) 25/2009 | Construction of drivers licence testing centre in Benoni | 18-Nov-13 |
CANCELLATION BID TECHNICALLY LAPSED |
R 0.00 |
Edwin Morulane | PS-WS 39/2013 |
Appointment of consulting engineers for professional engineering services for various projects in the multi year budgets until 30 June 15 |
18-Nov-13 | Civec Civil Engineering Consultants CC | R 4 938 142.20 |
Edwin Morulane | PS-WS 39/2013 |
Appointment of consulting engineers for professional engineering services for various projects in the multi year budgets until 30 June 15 |
18-Nov-13 |
Seasons Find 1287 CC t/a Epitome Consulting CC |
R 1 448 630.00 |
Edwin Morulane | PS-WS 39/2013 |
Appointment of consulting engineers for professional engineering services for various projects in the multi year budgets until 30 June 15 |
18-Nov-13 | Tsekema Consulting Engineers ([Pty) Ltd | R 2 121 580.50 |
Amanda Malhabathe |
A-RE (BM) 04/2013 | General building maintenance – as and when – until 30 June 15 | 18-Nov-13 | Maitemolatelo Business Enterprise CC | R 15 000 000.00 |
Amanda Malhabathe |
A-RE (BM) 04/2013 | General building maintenance – as and when – until 30 June 15 | 18-Nov-13 | L Ram Civil and Construction CC | R 15 000 000.00 |
Amanda Malhabathe |
A-RE (BM) 04/2013 | General building maintenance – as and when – until 30 June 15 | 18-Nov-13 | Maseno General Trading and Makhabaludaka JV | R 15 000 000.00 |
Thomas Sema | A-PT 03/2014 |
Supply, delivery and installation of paly detector machines as prescribed by the National Road Traffic Act Vol II Act 93 of 1996 as amended and SANS 10216 specifications at various testing stations until 30 June 16 |
25-Nov-13 | Workshop Electronics CC | R 2 313 000.00 |
Reggie Mabogoane | PS-SRAC 01/2014 |
Appointment of a service provider to manage the OR Tambo cultural precinct – including building management, maintenance, marketing and the delivery of cultural programs until 30 June 16 |
25-Nov-13 |
NON AWARD NO ACCEPTABLE BIDS |
R 0.00 |